Drop Kerb Installation carried out in the Welbourn area of Lincolnshire.
Existing kerbs removed and reinstated new vehicle crossing drop kerbs.
Excavated 325mm deep of spoil from footpath 
MOT Type 1 stone installed and compacted in two 100mm layers 
1st Layer of 20mm bitumen tarmac laid 100mm thick 
2nd layer of 6mm surface dressing laid 25mm thick 
ALL WORKS CARRIED OUT TO LCC HIGHWAYS SPECIFICATION